Tea shop marketing & events planner - holiday gift-set pre-sale launch checklist - delivery terms, break-bulk stock pools, price ladders, the associate talking-points card, and customization return boundaries, all checked in five groups before launch. Overselling and mixed messaging are launch-day discoveries otherwise
You are a launch-readiness checker for a tea
shop. Turn the checklist below into a printable
pre-launch inspection sheet. I'm the marketing &
events planner; this runs 7 days before a
holiday gift-set pre-sale goes live (Mid-Autumn
/ Lunar New Year).
How to use: five groups, 18 items, each with
"what to check" and "what to do if it fails."
Launch gate: the six diamond items must all
pass before launch; non-diamond items may
launch with a logged workaround.
[GROUP 1 - GOODS]
<> 1. One delivery story: pre-sale pickup date
and method (store pickup / delivery) exist
in exactly one version, identical across
store, online page, and service channel
Fails: no launch until aligned - post-
launch contradictions are the top complaint
source
<> 2. Break-bulk pool: can the teas inside the
sets also be sold loose? If yes, do whole
sets and loose grams share one stock pool
in the system? If no, is whole-set stock
locked?
Fails: freeze loose sales of those teas
until the pool connects - overselling is
otherwise a matter of time
3. Stock lock: pre-sale ceiling = locked
stock, with an oversell intercept at the
system level
Fails: manual daily reconciliation, written
into the shift duties
<> 4. Assembly capacity: sets assembled to
order (blending, engraving, hand-written
cards) - daily capacity number, and does
it survive the pre-holiday peak? The
question wants "boxes per day," a real
number
Fails: set a pre-sale cutoff date - close
early rather than deliver late
[GROUP 2 - PRICING]
5. Price ladder coverage: how many sets per
band (entry / mid / premium), checked
against last year's actual sales mix -
a gap band needs a new sku or a reprice
Fails: fill gaps with a build-your-own
set option
<> 6. Pre-sale versus walk-in pricing: the
pre-sale offer stated in one mode only
(pre-sale exclusive price / deposit credit
/ no discount, stock reservation only) -
the three never mix
Fails: default everything to "reserve, no
discount" and add offers later - align
first, discount second
7. Deposit rules: amount, balance deadline,
refundability - all three visible at the
point of order
Fails: bold and raise them - every deposit
dispute starts with "I didn't see it"
[GROUP 3 - MESSAGING]
<> 8. Associate talking-points card: one card
carrying delivery date, pricing terms,
return rules, stockout handling - the same
card for everyone
Fails: make the card before launch - three
associates, three stories, trust gone in
one conversation
9. Surge routing: when pre-orders flood, how
the store spreads pickup (time-slots,
staggered days) - and do the associates
know the drill
Fails: define it, brief it at shift start
10. Live inventory sight: can an associate
answer "how many can I still pre-sell"
on the spot? If not, they oversell or
wrongly refuse
Fails: give them at least a manual count
refreshed every two hours
[GROUP 4 - AFTER-SALES]
11. Customization return boundary: engraved,
hand-carded, custom-blended sets -
returnable under what conditions, and
does the restriction appear before the
order is placed?
Fails: set the boundary and surface it
pre-order; "found out after paying" is a
dispute factory
12. Stockout playbook: pre-sale hits its
stock ceiling before the cutoff - refund,
equivalent swap, or post-holiday delivery;
who may promise which
Fails: write the authority levels onto
the card
13. Post-season leftovers: unassembled
materials (boxes, canisters, pouches) -
sell loose, use for break-bulk, or hold
for next year
Fails: decide now; nobody has the energy
after the holiday
[GROUP 5 - ONLINE]
14. Online parity: the pre-sale page's
prices and extras match the store's
terms
Fails: reconcile to the store's terms or
pull the page
15. Page essentials: delivery date, deposit
rule, return boundary, stock ceiling -
all four findable on the page
Fails: add what's missing
16. Service templates: do canned replies
cover every term in items 1-15?
Fails: the talking-points card doubles
as the template base
[LAUNCH DAY]
<> 17. Full-chain test order, 24 hours before
launch: place one real pre-order yourself
- payment, record, store visibility,
fulfillment flag, end to end
Fails: any broken link gets fixed and the
test reruns - ten minutes of testing buys
the whole season
18. Day-one watch: reconcile orders against
stock every [watch interval] hours on
day one; oversells handled same-day
Fails: set the alarms, write them into
the duty sheet
Output: a printable inspection sheet (group /
item / check / remedy / tick box), diamonds
highlighted; footer line: "launch gate - all
six diamonds pass or the launch waits."
Why it is written this way
Gift-set pre-sale failures share a pattern: every one is discovered after launch - delivery terms contradicting, oversells from break-bulk, customization return fights - and every one was a one-line check beforehand. The checklist's value isn't completeness; it's the launch gate. Six diamonds (delivery story, stock pool, assembly capacity, pricing terms, talking-points card, full-chain test order) must pass or the launch waits - a seasonal pre-sale with a structural defect has no repair window once the season moves.
"Break-bulk pool" sits second in the goods group because it's the inventory trap unique to tea gift sets: the tea inside the boxes is the same stock as the loose-leaf wall, whole sets come apart, loose grams go into boxes - two ledgers drawing on one pool. Where the system doesn't connect them, overselling isn't an accident, it's scheduled. The check asks whether sets and loose grams share one number - a technical-sounding question that is actually the foundation of the whole season's stock order.
The talking-points card and the test order are the two cheapest, highest-yield items on the sheet. Three associates with three stories erase the customer's trust on the spot - one card fixes it. Placing one order yourself exposes whichever link from payment to fulfillment is broken - ten minutes the day before saves launch day. Making both of them diamonds is where this checklist spends its strictest budget.
Variables
| Variable | Description |
|---|---|
| Watch interval | Hours between order-versus-stock reconciliations on day one - set by expected volume; first seasonal run, every 2 hours |
| Capacity basis | Daily assembly output estimated on how many people for how many hours - include blending and packing end to end; round down |
| Pre-sale cutoff | When orders stop accepting - back-computed from capacity x remaining working days before the holiday; early beats late |