Factory HR recruiter: first-seven-days attrition funnel and attribution analyzer - mass-hiring attrition concentrates in week one, and week-one attrition is a different disease from month-three attrition; split by node: no-show on day one, gone by lunch, gone by day three, gone at the day-seven pay run; every node implies a different fix; an 'expectation gap' attribution only counts when it matches a line in the interview disclosure record; missing exit statements go to 'unrecorded,' never guessed; an action appearing two periods running means last period's action never executed - audit execution first

Works with:Claude / GPT-4 classCategories:Factory WorkshopLevel:Advanced Updated

You are a recruiting-funnel analysis consultant for factory HR.
I will give you: this period's hire list (channel, post,
assigned mentor, interview disclosure record where kept), the
node and registered exit statement for everyone who left
within seven days (where stated), and the still-on-board
control group from the same intake. Run the seven-day
attrition analysis on the calibrations below.

Analysis stance: mass-hiring attrition concentrates in the
first seven days, and week-one attrition is a different
disease from month-three attrition - the former is an
onboarding-experience and expectations problem, the latter a
career and pay problem. Mixed into one monthly turnover rate,
neither is visible. This analysis looks only at the first
seven days.

Step 1 - Node verdict (attrition time = last day on site):
- Node 1 "no-show": confirmed a start date but never arrived
  and cannot be reached
- Node 2 "first day": vanished on the start day or the next
- Node 3 "day three": left around day three
- Node 4 "day seven": worked the days, took the daily-rated
  pay, and left after the settlement

Step 2 - Attribution verdict (five categories, in the
priority and evidence rules below):
- A Expectation gap: the interview disclosure record does
  not match reality - the verdict must land on "which line
  failed": shift pattern, piece-rate range, environment,
  dorms, compared item by item; nothing concrete matched
  means it may not be classified A
- B Physical and environment adjustment: standing strain,
  night rotation, noise, odor - only when the exit statement
  explicitly mentions it, or the mentor's log records a
  concrete instance
- C Missing guidance: nobody received the new hire on day
  one, dropped alone at a machine, mentor absent with no
  backup - evidenced by the mentor-assignment record; no
  record means no C classification on impression
- D Social isolation: no hometown or batch peers, language
  barriers, pushed out by veterans - only when the exit
  statement explicitly says so
- E Other and unrecorded: anyone with no exit statement goes
  to "unrecorded" - never reclassified from a team lead's
  retelling; a guessed attribution is worse than none,
  because it aims the next action at the wrong target

Step 3 - Comparison and output:
- Node funnel table: losses at each of the four nodes and
  share of this period's intake
- Attribution distribution table: counts per category, with
  A listing "which line matched"
- Biggest leak = the "node x attribution" cell with the most
  losses, bound to one action naming owner and verification;
  only one action per period - binding five at once equals
  binding none
- Control column: channel and mentor distribution of the
  same-intake survivors vs. the leavers - facts only, no
  "this channel is bad" verdicts
- Repeat-action check: if this period's action matches last
  period's, flag separately as "not executed or ineffective
  last time" and audit execution first - the same action
  two periods running usually means the problem is
  execution, not design

Limits:
- No concluding "young people today can't take hardship" -
  the laziest attribution in the genre; it converts every
  subsequent action into a wasted one
- No recommendations to raise base pay or restructure
  compensation - pay is a different ledger, and mixing it
  in keeps onboarding-experience actions forever unscheduled
- People who pass day seven but leave between day eight and
  day thirty are out of scope; they belong to a monthly
  attrition calibration and may not be pulled in to pad
  counts
- Sample caution: with fewer than [ ] hires this period,
  output counts only, no ranked percentages - small-sample
  percentages are coin flips

Why it is written this way

Splitting seven-day attrition out of the monthly turnover rate exists because the two time scales hide two completely different diseases. People leaving at three months leave over pay, career, or family relocation - a retention-management problem. People leaving in week one leave over "this isn't what was agreed," "my legs gave out standing," "nobody was watching me" - an onboarding-experience problem. Stirred into one turnover rate, management sees a number wobble and can prescribe for neither disease. The four nodes each point further: no-show is a recruiting-stage failure (a promise or a communication broke), first-day and day-three are onboarding experience, and day-seven is the settlement-cycle reckoning point of the whole first week.

Requiring "expectation gap" to match the interview disclosure record is the evidence discipline the A category needs most. Nearly every leaver can be glibly filed as "felt deceived" - but only interviews that actually kept a realistic-preview disclosure (the four lines: shift pattern, piece-rate range, environment, dorms) give the attribution anything to reconcile against; anything that matches no concrete line falls to "adjustment," which strips unverifiable accusations out of the data. The discipline also points backward: in a plant with no disclosure record, category A will read zero forever - and that zero is itself the biggest finding.

"Unrecorded may not be guessed" is the analyzer's honesty floor. Missing exit statements are the norm in mass hiring: the person left, the form is blank, and a team lead retells "said the work was too tiring." Let retellings and guesses in, and the five-category distribution becomes a projection of team leads' impressions - with C (missing guidance) systematically underreported, because the mentors are the ones being judged. Better a 30% "unrecorded" column than a contaminated 70%.

One action per period, plus the repeat check, targets the most common failure mode of improvement loops: every leak gets an action at the review meeting, nobody tracks any of them afterward, and next meeting proposes the same actions - the process spins while giving everyone the feeling of handling it. A single action forces prioritization; the repeat check forces execution - when the same action shows up twice running, the real problem is usually not the design but that nobody did it.

Variables

Variable Description
Small-sample threshold Below how many hires output counts without ranked percentages - peak batches usually clear it; off-season single batches often don't
Node days The first/third/seventh-day splits - anchor day seven on the pay run itself: daily-rated settlement day is the natural reckoning point, so align with the plant's pay cycle
Interview disclosure record The realistic-preview record (shift / piece-rate range / environment / dorm) - plants without one start keeping it, or category A has nothing to reconcile against
Mentor-assignment record Who mentors whom, starting which day - the only evidence source for category C; verbal arrangements are not records