N NoBullshit.wiki 中文

NoBullshit.wiki

AI prompts you can actually copy and use

Type a keyword or model name to search all prompts

Hardware store inventory count specialist - unit-of-measure corruption early warning - before the stocktake launches, sweep the system on-hand: wire showing 3.6 rolls, screws at minus 14, the same tile model living as two lines of "12 boxes" and "37 pieces," last month 8 and this month 800 - all scar tissue from unconverted cut sales, white-slip issues and mis-keyed units, and none of these SKUs can be compared against a live count; the warning sweeps them out first, assigns each class one fix and one count-day treatment, and whatever cannot be fixed is suspended in the open with a reason, never quietly deleted from the count sheet

Works with Claude / GPT-4 class

Hardware & Building Materials StoreAdvanced

The most demoralizing stocktake outcome is not finding...

Hardware store stockroom manager - stock quality audit - cement caked, paint expired, tile chipped, board warped: sweep the storeroom for stock that "sits on the books but cannot sell as new," sorted into damp / expired / physical damage, with damp judged by its spread (the bags next to a caked one are halfway there), chips judged by stack level (the load-bearing bottom row), and the processing order ranked by "will it keep getting worse"

Works with Claude / GPT-4 class

Hardware & Building Materials StoreIntermediate

The most invisible loss in a hardware stockroom is...

Hardware store owner-operator - category role analyzer - split last year's sales into four roles (traffic / margin / cash-sink / unclear), because wire and pipe fittings must never be marked up on a whim (tradesmen come in for precisely those, and leave for precisely that), while power tools and standard locksets sit in a phone-comparison spotlight that decides whether the category is worth shelving at all - each category gets exactly one action, not a business review

Works with Claude / GPT-4 class

Hardware & Building Materials StoreIntermediate

Two thousand SKUs in a hardware store do not play the same...

Hardware store cash office clerk - delivery ticket three-way reconciliation audit - match each day's signed delivery tickets against the payment log and the on-account entries: a ticket with no booking is a receivable that never hit the books, a ticket that exceeds what was actually collected means road cash never reached the drawer, a ticket priced below the invoice means someone discounted on the spot with no paperwork, ranked by whether the money is still recoverable

Works with Claude / GPT-4 class

Hardware & Building Materials StoreAdvanced

At a hardware store, goods usually leave with nothing behind...

Hardware store manager - returns and exchanges SOP - cut-to-length wire is never refundable but sealed rolls are, tinted paint never but factory-sealed cans are, soaked or cut tile never but unopened boxes are, and a power tool that has been powered on goes to warranty service not the return counter - four hard rules on one archivable page, exceptions reserved to the manager and logged every time, so staff stop calling you about every return

Works with Claude / GPT-4 class

Hardware & Building Materials StoreIntermediate

Returns at a hardware store are far harder to judge than in...

Hardware store cash office clerk - contractor monthly settlement payment application SOP - when one transfer pays down five open tickets, the application order is fixed in writing (confirmed tickets first, oldest first within them), disputed tickets get pulled aside on the spot and never absorb a payment no matter how large it is, and a signed settlement confirmation with a photo copy goes to the customer - the paper wins arguments three months later, chat logs do not

Works with Claude / GPT-4 class

Hardware & Building Materials StoreAdvanced

The scary part of settlement day is not failing to collect -...

Hardware store receiving & inspection - bulk truckload counting and sign-off scripts - the driver is paid by the trip and pushing you to sign, and a truck of cement is dozens of stacks you cannot fully count: set the rule before unloading (one sentence), word the receipt notation that preserves your shortage claim when the stack interior cannot be counted, invite the driver to recount when the outer count misses the delivery note, and record damage as fact without assigning blame - four scripts to read aloud, because whether the signed receipt still counts later depends entirely on what gets said in those ten minutes

Works with Claude / GPT-4 class

Hardware & Building Materials StoreIntermediate

The truck of cement arrives; the driver is paid by the trip...

Hardware store manager - full-order completeness audit - scan a tradesman's big pick order against the original list right before it leaves the dock, hunting exactly three defect types: missing items (on the list, never picked), wrong spec (1/2" picked as 3/4", wire gauge mixed up), and missing companions (angle valves sold without thread-seal tape, hoses without washers, door stops without anchors) - ranked by whether the job site stalls, so five minutes at the loading door cancels one redelivery

Works with Claude / GPT-4 class

Hardware & Building Materials StoreIntermediate

What bleeds a hardware store dry is not a mis-price, it is a...

Hardware store inventory count specialist - bulk stack stocktake SOP - cement, sand, tile and board sit in full stacks that no count day can unstack bag by bag: count the exposed outer layers live, project the stack interior from the stack card (bags per layer times layers), pull selected stacks for a full unstacked calibration count each quarter, and when a calibration count blows past the tolerance line, audit that stack's entire receiving and issue history - the value of a projected count rests entirely on the stack card being true, so whoever fills it signs it

Works with Claude / GPT-4 class

Hardware & Building Materials StoreAdvanced

A stack of cement runs a hundred bags or more; unstacking it...

Security supervisor: underground garage flood-response SOP - a four-phase action table from weather warning to after the rain: flood boards and sandbags placed and every sump pump manually test-run before the storm, ramps staffed and pit levels watched during it, the power-cut order pinned to \"office-owned circuits first, owner circuits notified but never cut by proxy\", and after the rain the pumps keep running while damage gets recorded but never adjudicated; cars that stayed despite the relocation notice are never towed - only documented

Works with Claude / GPT-4 class

Property ManagementIntermediate

"The 72 hours after a storm warning are a park security...

Security supervisor: e-bike charging and parking early-warning - bikes parked or charging in evacuation routes and stairwells are red and get cleared the same day, battery-indoors and window-dropped cords are the biggest overnight risk; the warning's other half is the supply gap: until the count of violating bikes minus available charge points is closed, every cleared corridor refills within a week; no fire-probability forecasts, only an action order

Works with Claude / GPT-4 class

Property ManagementIntermediate

"E-bikes charging indoors are the hardest thorn in a...

Security supervisor: construction-access pass three-ledger audit - the approved pass roster, gate swipe plus manual-entry logs, and pass expiry dates checked against each other; a name outside the roster already inside means the failure has happened, not that it is a risk; one pass swiping at odd frequency gets its data pattern reported with no lending verdict; passes issued but never swiped form a ghost roster that simply does not renew; the closing move is badge-to-face checks at the gate, not \"tighten management\"

Works with Claude / GPT-4 class

Property ManagementIntermediate

"During renovation season, half the people a park gate...