Gas station inventory specialist - daily tank-gauging SOP - stick, water paste, temperature, conversion, ATG comparison in five steps under two-person check; a reading counts only when two consecutive dips agree, an ATG mismatch over the line gets re-measured the same day, and a second mismatch means the stick governs the books and the gauge gets a repair ticket - never 'tomorrow'
You are a gas station fuel-metering coach. Write a "daily tank
gauging SOP" for me, printable, executable. Fixed timing: after the
morning shift handover, and only when the tank had no drop today or
has settled [N] minutes after one - no gauging a just-filled tank;
that data is void.
Five steps; each carries "how / pass criterion / evidence":
Step 1 - stick the fuel height:
- Drop the gauge stick down the hatch guide vertically, touch
bottom, read to the millimeter
- Two consecutive identical readings before anything is recorded;
a third reading if they disagree, taking the agreeing pair; three
mutually disagreeing readings = stop, report the stick
Step 2 - check for water:
- Water-finding paste on the stick, held per the paste's dwell
requirement, read the color-change height
- Zero water is recorded as zero; any water height is recorded as
measured and reported to the manager over [ ] mm
Step 3 - temperature:
- Measure per the required depth points in the fuel layer, read to
the stated precision
Step 4 - conversion:
- Convert fuel height to volume via the tank strapping chart, then
apply temperature correction - by the company's named method;
the SOP says "per method X, page N" and never restates the
formula
- Record the direction of change versus the previous reading and
yesterday - a sudden move matters more than the absolute level
Step 5 - compare against the ATG:
- Stick volume versus ATG volume; difference within [X] = "compare
passed", logged
- Over the line: re-measure once, today; still over = the stick
governs the books, the ATG gets a repair ticket, and every shift
handover re-sticks until it is fixed - this is fixed; "tomorrow"
is not a step
Two-person check and records:
- Gauging and recording split: one measures, one reads aloud and
writes; both sign
- Record fields: tank, grade, time, stick height, water height,
temperature, converted volume, ATG reading, difference, two
signatures
Constraints:
- No estimating, no "close enough rounding" - the number is what
the stick said
- Whether the stick or the ATG governs the books: one answer,
chosen per company policy, written in the SOP's first line, one
standard for the whole station
- Chart pages, correction method, paste dwell times are blank
fields keyed to the manual and company policy, signed by the
filler
Why it is written this way
"No gauging a just-filled tank" leads the SOP because it is the biggest invisible polluter of the data: after a drop the surface sways and the temperature stratifies, and a stick taken then looks like a number but behaves like noise. Noise that enters the books fakes that day's inventory balance and skews the month-end loss attribution. Better one blank day for that tank than one invalid reading sitting inside a valid series - the first rule of gauging discipline is knowing which times produce numbers and which produce illusions.
"Two consecutive agreeing readings" looks clumsy and is the bottom line of error-proofing manual dips: a bent stick, an unseated bottom touch, a shaking hand on the pull - any single dip can wander millimeters, and millimeters map to tens or hundreds of liters on the strapping chart. Agreement before recording keeps random error out of the books, and three-way disagreement indicts the instrument rather than being averaged into inventory.
Step 5 is the most labor-intensive rule in the document and the least skippable. A station that lives with a chronic stick-ATG gap without a repair ticket gradually normalizes the difference - until the day a real leak lands inside the tolerance everyone got used to ignoring. "Never tomorrow" keeps the comparison an actual test instead of two numbers copied side by side.
Variables
| Variable | Description |
|---|---|
| Post-drop settling minutes [N] | Drop-complete to gauging interval, per company metering policy |
| Water-height report line [ ] | Millimeters above which the manager hears about it, per company policy |
| Stick-vs-ATG tolerance [X] | The pass line for comparison; over it, the SOP's re-measure path runs - no on-the-spot loosening |
| Which governs the books | Stick or ATG, chosen once, written in line one; the whole station answers to it |