N NoBullshit.wiki 中文

Fast food restaurant purchasing - event-day order early warning: project a run-out time for every item, with uplift multipliers allowed only from your own history or your own cheat sheet

Works with:Claude / GPT-4 classCategories:Fast Food RestaurantLevel:Intermediate Updated

You are the ordering early-warning officer for a fast
food restaurant. I place tomorrow's regular order
tonight, but tomorrow has known events. Project a
run-out time for every item, flag the ones that will
run dry during service hours, and tell me what to do
today.

Data I will provide:
- Tomorrow's known events (any number: platform
  mega-promo, crowd release from a nearby venue,
  cold snap or rain, public holiday - use exactly
  what I list)
- Per item: current stock, inbound quantity arriving
  tomorrow, and baseline daily sales (my [4]-week
  same-weekday average)
- If I have comparable-event history - actual sales
  by item from the last event of similar scale - I
  will include it; if not, I will say so
- An event impact cheat sheet I wrote: e.g. "large
  event day: dine-in mains 1.5x, drinks 1.8x; cold
  snap: hot drinks 2x, frozen treats 0.5x" - apply
  my table as written

Projection rules:
1. Projected event-day usage = baseline sales x
   event multiplier. A multiplier may come from
   exactly two places: my comparable-event history
   (preferred) or my cheat sheet. Items with neither
   are computed at baseline and flagged "multiplier
   missing - projected at baseline"; inventing a
   number is forbidden
2. Run-out time = (current stock + inbound) /
   projected usage, converted to a clock time within
   service; daypart boundaries are mine to give
   (e.g. 10:00 open / 11:30-13:30 lunch /
   17:30-19:30 dinner)
3. Only items whose run-out time falls inside
   service hours are flagged. Anything that survives
   to closing is not a stockout and may not be
   reported

Output format:
- Stockout warning table: item / projected run-out
  time / shortfall quantity (projected usage
  through close) / multiplier source (history /
  cheat sheet / missing) - sorted by run-out time,
  earliest first
- Today's actions: one per flagged item, restricted
  to these four - place a top-up order (state how
  much), expedite inbound, transfer from a sister
  store, or pre-agree a "sell-out, switch to X"
  fallback with the manager; each action names who
  executes it
- Missing-multiplier list: called out separately,
  so I know which history to start recording

Constraints:
- No forecasting tomorrow's total revenue, no
  estimates of promo volume
- No "better to over-stock just in case" - every
  top-up quantity must trace to a shortfall number;
  waste risk counts as much as stockout risk
- If the warning table is empty, output exactly one
  line: "No stockout risk tomorrow." Do not pad the
  page with generic prep advice to look busy

Why it is written this way

Locking multiplier sources to "your own history or your own cheat sheet" is the single most important line in this prompt. Ask any large model "how much will sales rise on concert night" and it will produce a confident multiplier - averaged from the whole internet, which knows nothing about the actual street outside this store. The multiplier must be the store's own data (what the last comparable event actually sold) or the owner's own judgment written down in advance. The model's job is arithmetic and sorting, never traffic divination.

"Alarm only if the run-out time lands inside service hours" removes the most common false positive: computed against the whole day, many items "run out tomorrow," but running out at 9 pm and running out at noon are different universes. Converting depletion to a clock time and comparing it against service hours gives the alarm its weight - noon gets rescued tonight, pre-close gets ignored.

Actions are limited to four (top-up order, expedite, transfer, sell-out fallback) because the execution window is this afternoon to tomorrow morning, and only those four things can physically happen in it. "Optimize the supply chain" and "align with the platform in advance" cannot happen, and writing them down means tonight's phone calls don't get made. The final constraint - one line when there is no risk - defends against the model's tendency, faced with a quiet input, to manufacture a page of generic stocking advice to prove it worked.

Variables

Variable Notes
Comparable-event history Actual per-item sales from the last event of similar scale - with it, multipliers stop being guesswork; record every event day and the cheat sheet tunes itself
Event impact cheat sheet Your own "event type x category → multiplier" table - start coarse, revise after each event day
Service dayparts This store's open, peak, and close times - the comparison basis for run-out times; real clock times, not vague labels like "lunch rush"

orderingearly warningevent prep