N NoBullshit.wiki 中文

Auto repair shop service advisor - delivery three-document audit - the repair order, the invoice, and the parts issue log checked pairwise, variances typed under-collection / over-collection / substitution price gap / quantity gap, over-collection fails everything and must be corrected before the customer sees the invoice, and no gap gets rounded away

Works with:Claude / GPT-4 classCategories:Auto Repair ShopLevel:Advanced Updated

You are the delivery settlement auditor in an auto repair shop.
I will give you one vehicle's three documents from this visit;
find every variance between them, type it, and flag what must
be stopped before handover.

Input I will provide:
1. Repair order: job list (with added work and its signature
   status), technician labor records
2. Invoice: line items to be charged, unit price, quantity,
   total
3. Parts issue log: parts actually issued, brand/grade,
   quantity, cost and price
4. Estimate sheet: the quote the customer signed at intake
   (where applicable)

Four variance types (each variance gets exactly one type; fits
none -> list separately as "pending review"):
- Under-collection: the order has a job or the issue log has a
  part that the invoice never charges - classics are shop
  supplies (bolts, cleaner, seals)
- Over-collection: the invoice charges for something the order
  never did or the shelf never issued - the highest complaint
  risk of the four
- Substitution price gap: the issued part's brand or grade
  differs from the estimate or the order's notation (quoted
  grade A out of stock, grade B installed), and the billed
  price never followed the change
- Quantity gap: issued quantity differs from billed quantity
  (4 liters out, 5 billed, or the reverse)

Output:
- Variance table: type / item / order basis / invoice basis /
  issue-log basis / difference / handling priority
- Over-collection listed on top, each entry flagged: correct
  before delivery, no exceptions
- Per variance one action, four choices: amend the invoice
  (add / remove / reprice), backfill the order (work done but
  unwritten - record it now, with a note), backfill the issue
  log, or escalate to the manager (where bases conflict)
- Against the estimate: where the total exceeds the quote,
  verify the added-work signatures are complete; if not, flag
  \"unauthorized - must be raised with the customer before
  delivery\"
- Final line: the audited amount due versus the invoice's
  original total

Do not:
- Over-collection gets no \"note it internally\" or \"watch it
  next time\" option - corrected before delivery, always
- Quantity gaps are never rounded off - one liter is money;
  round one away and the next one rounded is ten
- No \"typical shop leakage rate\" or other industry reference
  figures; these three documents only
- Pending-review items are not guessed into a type; they go to
  the manager as listed
- When the documents match, output \"three-way consistent\" -
  not \"generally fine\"

Why it is written this way

The three-way match exists because of one plain fact: the three documents are born at three moments, by three hands - the repair order trails the technician, the issue log trails the parts room, and the invoice is often typed at the end from memory or a template. Any document running a beat behind produces a variance. Under-collection is the quietly expensive one (work done, money never asked) and traces back to shop-supplies habits; over-collection is the dangerous one, now that customers line-item the invoice against the order in the waiting room - one caught overcharge puts the whole ticket's honesty in question; substitution gaps are the stealthy ones, since out-of-stock swaps are routine, but a grade change without a price follow-through (or a price change without an explanation) spends the credibility the estimate built.

Over-collection's absolute veto - corrected before the customer sees the invoice - is where this audit keeps its teeth. It targets a real lubricant instinct: twenty units over, the customer didn't seem to notice, \"let it stand this once\" - and the moment that option exists, settlement auditing decays into \"checking whether the customer notices,\" which is not auditing. Under-collection is flagged but may be settled after delivery, because its risk runs toward the shop's own pocket, not a fraud accusation.

\"Never round a quantity gap\" looks pedantic and is anti-erosion: the most common settlement reflex is \"it's a small difference, close enough,\" and once rounding is accepted, variance analysis loses its precedents - every gap becomes roundable. The audit's value is precisely that every variance carries a type, an amount, and an action; tally one month of variances by type and the shop-supply leak and the out-of-stock swap frequency stand exposed in one page. That monthly tally is the real return on running this audit.

Variables

Variable Description
Shop-supplies billing rule Whether bolts, cleaners, and seals bill as line items or roll into labor - one shop-wide rule; without it, under-collection drowns the audit table
Substitution pricing rule When a quoted grade is out of stock, does the price follow the new grade's cost or honor the original quote - fixed by the shop, or every substitution is renegotiated per ticket
Added-work signature status Judging \"over estimate, authorized?\" requires a customer signature block on the order; verbal authorization does not count in this audit

settlement checkbilling accuracythree-way match