N NoBullshit.wiki 中文

Hardware store driver & delivery - delivery damage dispute scripts - intact-wrapped tile that opens up with three chips, next-day phone call claiming two missing bags of sand, the installer saying flat out "it was broken when you brought it" - three scene cards: what is found on the spot gets photographed and written into the receipt on the spot, next-day claims get answered on the timeline not the emotion, and when it turns confrontational the driver neither owns the whole fault nor blames the loading crew - the discovery moment is the one watershed the entire dispute turns on

Works with:Claude / GPT-4 classCategories:Hardware & Building Materials StoreLevel:Intermediate Updated

You are a delivery complaint coach for a hardware and
building-materials store. Build me script cards for delivery
damage disputes. I am the driver; I run the day's route alone,
no manager riding along.

My situation:
- Liability for damage or shortage could sit at the factory, at
  loading, on the road or at unloading - on site I cannot
  actually judge it, and judging it would settle nothing
- My on-site authority: swap from truck spares, write the
  receipt; money - refunds, compensation, discounts - is not
  mine to give
- The customer is a contractor or homeowner; the installer is
  on site with the schedule pressing; everyone is in a hurry

Scenes (one card each):
Scene 1: At handover the installer opens the boxes and finds
        chips - "How is this broken? I'm not taking this."
Scene 2: Next-day phone call - "Yesterday's sand was two bags
        short. What's going on over there?"
Scene 3: The installer locks it in on the spot - "Stop taking
        photos, it was broken when you loaded it, crushed in
        the truck. Twenty years I've done this."

Each card has five fixed fields:
- First sentence: speakable as written. Different in every
  scene, but one iron rule shared: no confession, no blame.
  No confession - the sentence "it's our fault," spoken at the
  curb, becomes the store's verdict of full liability, and the
  driver on site lacks the information to make it. No blame -
  "the loading crew crushed it" or "it left the factory like
  that" is equally unprovable, and it converts the installer
  into an opponent on the spot. What remains for the first
  sentence is facts and actions
- On-site actions, in order: photograph (close-up of the
  damage plus the piece where it lay in the stack), write the
  receipt (the three figures: received / swapped / returned),
  swap from spares. In scene 1 these three close the dispute
  where it opened
- How the receipt reads: scene 1, written as it happened
  (swaps and returns entered); scene 2, steer the caller -
  "let's first check what yesterday's receipt says" - the
  receipt is the one thing both parties signed, so the
  conversation works from it, and claims with nothing behind
  them enter the store's process
- Reporting back at the store: facts only (which customer /
  what time / which goods / the installer's words verbatim /
  what I did / the photos) - never "I think it got crushed at
  loading." Attribution needs the loading photos and the
  stacking order, which exist at the store, so attribution
  happens at the store
- The cooldown line for flaring tempers: one sentence that
  concedes no liability ("let your installer keep working,
  don't lose the schedule - you'll have an answer today").
  Catch the schedule first: on a job site, the schedule is
  the biggest stake there is

Scene 3 gets an extra passage: when a twenty-year veteran
declares the verdict, do not debate the technicals - the
debate is lost the moment it starts. Move the topic from
"whose fault" to "what happens to the goods": today the
replacement pieces go up so the site keeps moving, and the
store settles liability against the photos afterward. His
call may be right or wrong - but a technical argument on the
curb produces conflict, never conclusions.

Constraints:
- Every line speakable as written; unspeakable phrases like
  "stay calm" or "handle it properly" are not lines
- Promise nothing beyond authority: amounts, refunds, "it
  will never happen again"
- Presume nothing about the installer ("he's angling for a
  freebie") or the store ("they'll never accept it")
- No store name; say "our store"

Why it is written this way

The first-sentence iron rule - no confession, no blame - is the foundation of the whole set. The driver on site lacks the information to assign liability: which link broke the goods is a question that requires the loading photos and the stacking order, and what he has at the curb is a truck and a hurried installer. Confessing "our fault" converts a judgment he cannot make into the store's final verdict; blaming the loading crew turns an equally unprovable sentence into testimony while pushing the installer into opposition. With both doors closed, the first sentence can carry only facts and actions.

The three scenes orbit one watershed: the moment of discovery. Found on the spot (scene 1), the evidence stands - photograph, swap, receipt - and the dispute dissolves where it opened, at the lowest possible cost. Reported next day (scene 2), the site is gone, and the only fact both parties ever confirmed is the three figures signed on the receipt - so the script steers the call to "let's work from the receipt," and claims with no receipt behind them enter the store's process. That is not deflection; it is routing an unverifiable claim into a recorded channel. Scene 3 is the deepest standoff: the veteran's judgment may be right or wrong, but a technical argument at the curb yields conflict, not conclusions - so the topic moves to "the pieces go up today, liability meets the photos later." Schedule first, evidence second.

The cooldown line that catches the schedule first is built for job sites specifically. The biggest stake on a renovation floor is not compensation for one chipped tile - it is the schedule: the installer waiting is the job stopped, and the contractor stopping owes the homeowner an explanation. "Let your installer keep working; you'll have an answer today" concedes nothing and settles the other side's most urgent interest; once the site is running again, the conversation has room. Reverse the order - argue liability before fixing the goods - and every minute feeds the fire.

"Report facts only, no attribution" stands as its own field because every causal remark the driver makes on site mutates into position paper back at the store - "even the driver says the loading crushed it" can fuel a week of argument, from an offhand sentence spoken to get through a moment. The evidence attribution needs (loading photos, stacking order, route) lives at the store, so the attribution belongs there. What the driver hands back is a clean site record, not a draft verdict.

Variables

Variable Description
Driver's on-site authority How many pieces he may swap on the spot, how much he may concede (chipped tiles topped up by the piece, no accounting) - a written boundary is what lets the driver act; disputes with no on-site authority all bounce back to the store, and the schedule cannot wait
Next-day claim acceptance terms How long after sign-off a damage claim is accepted and on what evidence (receipt + site photos) - the store sets the terms and briefs the driver, so the phone call has something to cite; without terms, the call is carried by attitude alone
Who escalates to the site When the curb cannot hold, who comes - manager or owner - and how fast - "you'll have an answer" lands only when a person arrives; a dispute phones cannot settle makes a promised deadline an empty phrase

damage disputesliabilitycomplaints