Warehouse manager: material lot-traceability and quarantine SOP - freeze first, trace second; a three-column flow list (in stock / in process / shipped) inside two hours; the quarantine boundary grows only with issue records and never shrinks with nerve, and release requires a re-inspection record
Works with Claude / GPT-4 class
Factory WorkshopIntermediate
"When a material lot goes bad, the first two hours decide...