Online store operations - 7-day product testing SOP - a test run answers 'is this worth investing in,' not 'is this a good product'; without thresholds written down before day one, the team treats 'let's keep watching' as a decision, and three weeks later the new-arrival shelf is full of half-dead listings, each one eating maintenance time
You are an e-commerce operations process designer. Turn the
testing SOP below into an archive-ready, executable policy document
- keep every rule, fill in forms and role details, output
printable Markdown. Scope: days 1-7 after a new listing goes live.
One batch per testing window; every item in the batch runs under
identical conditions.
Test discipline (fixed; violating any one voids that item's data):
- All items in a batch run identical traffic conditions: same
budget, same bid strategy, same time slots - vary the product,
not the conditions
- No edits to title, main image, price, or description during the
window - one edit and that item's cart and conversion data can
no longer be attributed; void and retest
- Each batch includes one incumbent listing as the baseline, run
under the same conditions - thresholds aren't invented, they're
run by the baseline
Pass lines (judged at day-7 close; published before day 1; never
moved afterward):
1. Cart rate: adds-to-cart / visitors >= baseline's same-window
rate x [ ]%
2. Inquiry conversion: inquiry orders / inquiries >= [ ]%
3. Early refund line: refund rate within 7 days <= [ ]%
Three outcomes (day 7 must land in one of them; there is no fourth
outcome called "keep watching"):
- All three pass -> graduate: into the normal catalog; budget and
promotion per standard listings
- Partial pass -> fix ONLY the failing line; which line failed
dictates the fix:
- Cart rate failed: product or image problem - retest with a new
main image ONLY; no sneaking in a price change
- Conversion failed: price or service-script problem - read the
inquiry logs first; no reflex price cuts
- Refund line failed: goods problem - back to sourcing to check
the supplier; not fixable on the operations side
After the fix, extend [ ] days for a second verdict; fail again
-> eliminate. One fix round per item - a second fix round is a
retest wearing a costume
- All three fail -> eliminate: delist, clear samples; items over
the refund line also file a sample-disposal plan in the
elimination log. No "leave it up and see" listings
Records:
- One test card per item: live date / actual values on all three
lines / outcome / fix applied (if any) / graduation or
elimination date
- Cards archived monthly - their value arrives six months later:
when the next batch is selected, the old cards show which kinds
of products repeatedly die on which line; that is the most
honest feedback selection ever gets
Prohibitions:
- No extending the window because "this one feels like it will
pop" - feelings go in the card's notes field and influence
nothing
- Thresholds never move after data is visible - moving the line
afterward isn't a verdict, it's sourcing justification for a
conclusion someone already wanted
- The baseline listing never changes mid-batch - swap it and every
line from the earlier days is void
Why it is written this way
"Vary the product, never the conditions" is the entire scientific basis of testing. The question is "is this product worth investing in," and it is answerable only if the products are comparable - same budget, same bids, same slots, the only variable being the item itself. The moment one listing gets extra budget or a mid-test price edit, its cart rate becomes uninterpretable: good product, or good conditions? The void clause exists so that "voided" is a legitimate institutional outcome rather than the start of an operator saving face with corrupted data.
Thresholds come from a run baseline rather than invention because it ends the eternal argument about where to set the line. The baseline is an incumbent, proven listing; its same-window cart rate IS "what a viable product does in this store at this time" - closer to this store's reality than any industry benchmark. The baseline pays a second dividend: if an entire batch collapses AND the baseline also ran anomalously low, the problem was the traffic environment that week, not the products - void the batch, execute nobody.
The heaviest design sits in the partial-pass branch: fix only the failing line, and let the failing line dictate the fix. Each line binds one organ - cart rate binds product-and-image (saw it, didn't want it), inquiry conversion binds price-and-script (wanted it, didn't order), early refunds bind the goods (ordered it, regretted it). The classic wrong move on "carts pass, conversion fails" is cutting the price - one cut and both metrics move, and round two is unattributable again. Locking the fix to the failing line keeps the test causal rather than lucky.
"No fourth outcome" is the SOP's main reason to exist. Half-dead listings generate no sales but constant cost: stock tied up, listings to maintain, a line item in every weekly report. Worse is attention drain - an operator babysitting fifteen "keep watching" links has nothing left for the three that could pop. "Keep watching" is just today's decision deferred into future inventory; the SOP welds that exit shut with "day 7, choose one of three."
Variables
| Variable | Description |
|---|---|
| Cart-rate coefficient | What fraction of the baseline's rate a newcomer must hit - usually below 100% since new items carry no sales history |
| Conversion line | Inquiry-to-order floor - set on your own service team's actual conversion, never copied from industry figures |
| Refund ceiling | 7-day refund cap - by category norms; apparel runs structurally higher than standardized goods |
| Second-verdict days | Extended window after a fix - 3 to 5 days; longer is just "keep watching" in uniform |