Livestream E-commerce marketing & events planner - fan-fest mega-show day-of execution checklist - big shows do not fail on creativity, they fail in the seams: a lottery drawn before its rules were ever published, winner lists never archived, on-air promises that silently evaporate after the stream; three time-ordered sections, every item nailing down what to look at, what counts as a fail, and the first move when it fails

Works with:Claude / GPT-4 classCategories:Livestream E-commerceLevel:Intermediate Updated

You are the event execution supervisor for a livestream selling
room. I am preparing a fan-fest mega-show: roughly [ ] hours
long, with [ ] lottery rounds, [ ] giveaway products, and [ ]
hourly lucky-bag drops. Expand the day-of execution checklist
below into a printable version fitted to my show parameters:
every item must state "what to look at, what counts as a fail,
and the first move when it fails," ordered by time, not by
importance.

Section 1 - Pre-show (completed within 120 minutes before going
live):
1. Lottery rules disclosure: check the stream overlay or pinned
   comment for four elements - draw time, prize names and
   quantities, eligibility conditions, drawing method. Any
   missing element is a fail. First move: publish the complete
   rules before scheduling any draw; "draw first, patch the
   rules later" is forbidden
2. Giveaway link check: open every giveaway link and compare the
   realized price against the mechanics sheet. Any mismatch is
   a fail. First move: correct the host script to match the
   link's actual price - never go live carrying a dispute
3. Prize physical reservation: check that lottery prizes and
   promised gifts are stock-reserved or physically sealed. A
   promised-on-air gift that exists only on paper in the
   warehouse is a fail. First move: swap the prize or cut the
   quantity, and update the host script to match

Section 2 - Live (executed at the top of every hour):
4. Draw on schedule: compare the actual draw time against the
   published time. Running more than [ ] minutes late is a
   fail. First move: the host apologizes on air and draws
   immediately
5. Winner archiving: after each round, check that the console
   operator screenshotted the result (winner accounts and
   timestamps) into the day's folder. One missing round is a
   fail. First move: screenshot immediately - never rebuild a
   winner list from memory afterwards
6. Giveaway budget slices: check this hour's giveaway volume
   against the budget slice sheet. Overshooting the slice by
   [ ]% is a fail. First move: cut the next hour's lucky-bag
   frequency to claw the budget back - never rob the closing
   segment's allocation to fill the hole

Section 3 - Post-show (completed the same day):
7. Winner list publication: check that the list was published
   in the room or the fan group before the stream ended and
   screenshot-archived. Not published is a fail. First move:
   publish immediately, stating the prize shipping deadline
   inside the list itself
8. On-air promise closeout: reconcile every gift or coupon
   promised on air against fulfillment records. A promise with
   no fulfillment record is a fail. First move: fulfill before
   the next day's stream - promises must not silently evaporate
9. Discrepancy log: record every "said versus did" mismatch
   from the day into the discrepancy table, feeding the next
   event's retrospective

Append a signature block per section (executor / time /
reviewer) and state: only when all three sections are signed and
archived is this show's execution formally closed.

Limits:
- The checklist governs execution only; it does not judge the
  event concept or game design
- Every "first move" must be doable on the spot - no "optimize
  in the retrospective" placeholders
- Do not hardcode the lottery tool's name; leave a placeholder
  for whatever tool my room actually uses

Why it is written this way

Time order, not importance order, because on mega-show day attention flows with the clock: skip item 1 (disclosure) and you discover it at item 4 (the draw), when the repair window has already closed. Importance sorting forever pushes "not urgent but gate-like" items - disclosure, archiving - behind "urgent right now" items like GMV and concurrency. Only a time-ordered list can be taped to the director's console and actually walked.

"Publish the four lottery elements before scheduling the draw" is structural prevention against the rigged-lottery accusation. Complaints land after the draw, but the disease is always pre-draw: a prize awarded under unpublished rules looks suspect no matter how cleanly it was drawn. "Draw first, patch later" is the most common way of compounding the error, so the checklist bans it outright.

Same-day closeout of on-air promises chokes off the screen-recording dispute three days later. A gift the host improvised on air, nobody logged, nobody followed up - then the customer arrives holding the recording, and customer service can only cave, at a cost far above one extra gift. The closeout itself is light work: tick down the day's on-air promise log line by line. But it must live in the checklist, because actions that live nowhere do not happen after a mega-show breaks up.

The signature blocks are the checklist's teeth. Without them, "checked all nine" and "checked none" are indistinguishable in the archive; with them, three signed sections close the show, and any failure localizes to who was on shift. Signatures record facts, not blame - the moment they carry punishment, they decay into rubber stamps.

Variables

Variable Description
Show parameters Duration, lottery rounds, giveaway count, lucky-bag drops - these set Section 2's loop count and Section 1's checking workload
Draw lateness tolerance Minutes of lateness before it counts as a fail - set in minutes; "as soon as possible" is no tolerance at all
Budget-slice overrun threshold What percentage over the slice triggers the squeeze - set by how rigid the budget is; rooms with hard commitments in the closing segment need a tighter threshold

event-executionlottery-disclosurepromise-fulfillment